A Training Center for the Peacekeeping Operations of the 311th Armed Force Division has been opened. This sports complex has been built within eight months; the total construction budget being MNT 1.6 billion. The Ministry of Defense has covered all this charges. The opening of this training center gives Mongolian peacekeeping troops greater possibilities for developing their professional skills as well as body building. Construction was undertaken by the Industrial Union of Defense and Construction Division with “Narta” as a sub-contractor.